Project:

ATEX & DSEAR Compliant Grain Handling & Storage System

Location:

Speyside

Value:

£975K

Client:

Forsyth Group

Date:

Project Overview:

As part of a large scale project, Don Valley Engineering supported the main contractor with the design, supply and installation of a full grain intake and conveying plant complete with 420 tonne storage capacity, sampling, dressing and process weighing facilities and ATEX compliant dust extraction system for the world renowned Macallan Single Malt

For more information….Download Project Data Sheet


Project:

Complete Maltings Upgrade & Plant Modernisation

Location:

North Scotland

Value:

£6m

Client:

Global Blue chip Drinks Producer

Date:

Project Overview:

As the main contractor, Don Valley Engineering embraced the responsibility of a major, multi million pound maltings plant refurbishment project providing the latest process knowledge & design to the client. As Principal Contractor , Don Valley Engineering successfully managed the site operations of its 30+ strong team & various subcontractors.

For more information….Download Project Data Sheet


Project:

Specialist Malt Kiln for Peated Whisky

Location:

East Yorkshire

Value:

£2.5m

Client:

Muntons Plc

Date:

Project Overview:

Don Valley Engineering won a competitive tender to supply a specialist kiln for producing peated malt for the production of malt whisky. The company’s significant knowledge of this type of equipment meant the client would get a functional & robust plant suitable for the severe operating conditions created by the peat smoke.

For more information….Download Project Data Sheet


Project:

Grain Handling Belt Conveyors with Fire Detection System

Location:

Berwick

Value:

£295K

Client:

UK Maltster

Date:

Project Overview:

Following a process fire, Don Valley Engineering were asked to replace the 2 main plant conveyors, totaling over 150m, to urgently bring the plant back to full operation. A number of improvements over the previous conveyors were designed and implemented by Don Valley engineers to ensure the previous issues were not repeated

For more information….Download Project Data Sheet

 


Project:

FGD Reception Facility

Location:

Bristol

Value:

£

Client:

EXTEX Siniat

Date:

Project Overview:

Design Supply of new FGD truck Unloading system, designed to receive 10 trucks per hour. Material delivered by Rail is offloaded into Trucks and delivered to the Bulk Reception Unloader, Where the FGD is discharged on to the Apron Belt and transferred to a tripper conveyor feeding a bulk store. Don Valley Engineering in conjunction with sister company Cleeve MH provided the design Supply and Mechanical Erection of the plant and equipment.


Project:

Ash Returns System

Location:

DRAX Power

Value:

£650k

Client:

LYTAG Aggregates

Date:

Project Overview:

Design Supply of new Pneumatic conveying system to return filtered PFA dust from the process area back to the PFA feed supply line. The project involved the design and supply of a new Dense phase conveying system, Bulk storage silos and hoppers, Mechanical erection of the Don Valley Engineering equipment and 3rd party plant supply. Including all site supervision.


Project:

Carbon Mixing

Location:

Bawtry, Doncaster

Value:

£1.2m

Client:

Thomason's Leeds

Date:

Project Overview:

Rebuild of a Mixing Tower, for Bawtry Carbon International following severe fire damage. Don Valley Engineering limited appointed CDM Principal Contractor by Thomason’s main contractor for the project. Don Valley Engineering oversaw all site supervision for the execution of the Mechanical & Electrical installation work and construction phase of the project. The project involved site management of a multi-disciplined work force made up of European companies The project was delivered to budget and ahead of the project program.


Project:

Fuel Blending Plant

Location:

Ferrybridge

Value:

£2.6m

Client:

Keadby Generation

Date:

Project Overview:

For the blending of raw coal to feed the Power Stations fossil fuel feed system The principle behind the project was to enable the client to mix and blend coal from a stock pile of over 3m tonnes with new coal,being brought in by rail. The client requested that the DVE system would have to be capable to feed material at 800tph as a back-up route to the station in case the rail system was disabled in any way. The project was successfully delivered to the agreed program and budget.

Call Us NOW!
We can help you.

Monday – Friday
8.30am – 5.00pm

01302 881188

Not a fan of the
phone?

Don’t worry, you can
contact us by email

Click here!

Click here to download
our brochures

To find out more why
not read our brochures

Click here!

What our customers say